Pages
Title Image

Subgrade Pad & Footings

Subgrade Pad & Footings

Prior to the building arriving on site, a subgrade pad or a subgrade pad with perimeter concrete footing will be installed. A perimeter concrete footing may be requested depending upon the frost depth and/or soil type of the area in which the building will be installed. If a footing is requested, the building will be secured to the footing at the time of installation. PRC will provide a foundation prep plan for the local engineer or general contractor ahead of time to prepare the installation pad.

Public Restroom Company will complete your building’s installation within 3 to 5 days. Our OSHA certified, experienced staff travels nationwide to complete final installation on each building.

When the building arrives to your location, a large crane will lift the multi-ton, prefabricated structure off of the transport trailer and onto a site prepared building pad/foundation within a few hours. Utility point of connections (POC) are stubbed out six (6) feet from the building. All final utility connection and sidewalks are completed by outside parties of your choosing and in compliance with state and/or local authorities.

01

Subgrade Pad without Footing

Prior to Install

Installation of Building

02

Subgrade Pad with Footing

Prior to Install

Securing Building to Footing

Installation of Building

Secured Building to Footing