1-888-888-2060
Facebook | Twitter | YouTube | LinkedIn | Mailing List
OPTIONS / Footing Options

Think different. Think prefabricated.

Sub Grade Pad Options

A sub grade pad or perimeter concrete footing will be installed prior to the building arriving on location. A perimeter concrete footing may be requested depending upon the frost depth and/or soil type of the area in which the building will be installed.  If a footing is requested, the building will be secured to the footing at the time of installation.  
 
Public Restroom Company completes installation in 3 – 5 days. Our OSHA certified experienced staff travels nationwide to complete final installation on each building. A sub grade pad and/or concrete footing is installed prior to the building arriving on location. A large crane lifts the multi-ton, pre-fabricated structure off the transport trailer on to a site prepared building pad/foundation in just a few hours. Utility point of connections (POC) are stubbed out six feet from the building. Final utility connection and sidewalks are completed by others.
Sub Grade with Footing
Sub Grade with Footing
Sub Grade Pad without Footing
Sub Grade Pad without Footing
Securing Building to Footing
Securing Building to Footing
Install without Footing
Install without Footing